The City of Prince Albert is set to begin the repaving of 2nd Avenue West on Monday, May 27, 2024. This project, covering the stretch from Marquis Road to 28th Street West, is an essential upgrade to one of the city's main arterial roadways. The repaving is expected to be the most disruptive roadwork for motorists this summer as 2nd Avenue West serves as the primary north-south route for residents and visitors travelling through Prince Albert to the lakes.
Project Schedule and Traffic Accommodation:
The repaving will be executed in two phases with specific traffic management plans to minimize disruption:
Phase 1: 2nd Avenue West from Marquis Road to 32nd Street West
Dates: May 27 to June 11, weather permitting
- Scope of Work: Full-width milling and paving of the road.
- Traffic Management: Two-way traffic will be maintained on 2nd Avenue West.
- Business Access: Businesses will not have direct access to 2nd Avenue during paving operations.
Phase 2: 2nd Avenue West from 32nd Street to 28th Street West
Dates: June 12 to June 26, weather permitting
- Scope of Work: Full-width milling and paving of the road.
- Traffic Management: Two-way traffic will be maintained on 2nd Avenue West.
- Business Access: Businesses will not have direct access to 2nd Avenue during paving operations.
Important Information for Businesses and Motorists:
- Alternative Access for Businesses: Businesses affected by the repaving are encouraged to coordinate with neighbouring businesses to allow patrons to use adjoining parking lots to reach their destinations.
- Avoid Driving on Freshly Paved Surfaces: Driving on freshly oiled asphalt can damage your vehicle and degrade the quality of the new road surface. Please refrain from driving on freshly paved areas.
- Road Closure Updates: Notices will be issued before moving to a new work zone. For the latest information on current work zones, please visit www.citypa.ca/roadclosures.
This project is funded 70% through the Saskatchewan Ministry Urban Highway Connector Program and 30 % through the annual Capital Paving Program. We appreciate your patience and cooperation during this essential repaving project.
For further information or media inquiries, please contact:
Evan Hastings
Capital Projects Manager
306 953-4900