During the detailed design phase the finer elements of the facility were finalized. The drawings below were at 75% completion with many of the key features taking shape. The project is now in the construction stage.
Major Project Milestones:
- Preliminary and Conceptual Design (Complete)
- Detailed Design (75% Complete)
- Bidding and Tendering
- Phase 1 – Construction (Twin Arenas and Aquatics)
Construction Progress Updates - Post Construction